AR Brief subject: 'SECC' building (actually named the Clyde Auditorium)

Group discussion to decide on key points to achieve:
- Scale of our model
- Type (e.g Site along with surroundings, cross section ect)
- Finish of the model
Initial Ideas:
1. Full building and Surroundings. (scale 1:500?)
2. Full building with 'cut away' outer shell.
3. Half building with a center split to reliel seating area. (Rest of ground floor and immediate surrounding area etched in to continue from the model cut off point)
Issues
- Having a 'cut away' section means alot of detail will have to be included and will require more detailed plans
- We only have plans for part of the building (Crucially the ground floor is missing aswell as front and back elevations)
- Plans of the site are proving useless and a guide to theoverall dimentions of the building due to the lines not even joining up at the edges!
- Group still undecided on all 3 initial key points.
No comments:
Post a Comment